
Harmonics Pro
A downloadable DAW Tool
Harmonics Pro - Early Development
Harmonics Professional, better known as Harmonics Pro, is an all-in-one music production suite for creating, recording, tuning, arranging, shaping, and finishing complete tracks on Windows. It combines a full song composer, recording studio, vocal tools, MIDI support, effects, virtual instruments, automatic music generation, and the built-in VocalForge Pro vocal tuning system in one package, with no subscriptions
Whether you want to build a song from scratch, record vocals over a backing track, generate new musical ideas, practise singing, or export a finished mix, Harmonics Pro is designed to keep the whole workflow in one place.
Compose complete songs
The Composer gives you a bar-based timeline, clip-style arrangement, note editing, chords, harmony tools, drum editing, mixing, and track effects. You can create and arrange full songs with separate tracks for instruments, vocals, drums, bass, chords, melody, pads, and more.
The built-in GENERATE system can create:
- Beats and drum patterns
- Bass lines
- Chord progressions
- Melodies
- Harmonies
- Pads
- Complete songs
You can choose the genre, rhythm, complexity, tempo, key, scale, song length, seed, and where the generated music should be placed. Supported styles include pop, rock, punk, hip-hop, trap, R&B, lo-fi, EDM, house, synthwave, jazz, blues, cinematic, gothic, industrial, metal, techno, trance, folk, piano and many more.
VocalForge Pro built in
Harmonics Pro includes VocalForge Pro, a complete vocal tuning and processing system for recording, correcting, cleaning up, and shaping vocals.
VocalForge Pro includes key and scale control, retune speed, humanize, flex tuning, tolerance, transitions, vibrato controls, formant shifting, transpose, range settings, automatic key learning, and one-click vocal correction.
It also includes a full vocal effects chain with EQ, de-essing, compression, saturation, delay, reverb, harmonies, doubling, chorus, lo-fi effects, limiting, and a large collection of vocal presets and styles.
VocalForge Pro is also included as a VST3 plug-in, allowing you to use the same tuning system inside DAWs and audio software including FL Studio, Ableton, Audacity, REAPER, Cubase, Studio One, Bitwig, Cakewalk and more.
Peer - To - Peer
Harmonics Pro includes peer-to-peer collaboration so multiple musicians can work on the same song together in real time. One person hosts the session and shares an address and session code, while others join directly from their own copy of Harmonics Pro. Only the song data is shared between users — such as notes, instruments, effects, and arrangement changes — while recorded vocal files stay on each person’s own computer. The built-in session chat also makes it easy to discuss ideas while writing, arranging, and refining the track together.
Huge sound library
Harmonics Pro includes more than 1,000 built-in instruments, including hundreds of real recorded instruments, along with support for SoundFont and SFZ libraries.
There are also 158 optional sound packs covering instruments, drums, synths, orchestra, voices, world instruments and more.
The included sound libraries are free to use in music you create and sell. If a library requires attribution, Harmonics Pro automatically tells you what credit is needed when you export your song.
MIDI and virtual piano
Harmonics Pro supports MIDI keyboards and controllers for both normal music production and live playing. You can record MIDI directly into tracks, use sustain, pitch and modulation controls, and play built-in or VST3 instruments.
There is also a built-in virtual piano that can be played using your mouse, computer keyboard, or MIDI controller.
Effects, plug-ins and mixing
Tracks, song sections and the master output can use a wide range of effects including EQ, compression, saturation, chorus, phaser, delay, reverb, filters, stereo width, bass control, tape effects, trance gates, auto-pan and more.
Harmonics Pro can also host VST3 effects and instruments, and includes a built-in plug-in manager with one-click installation for a collection of free open-source synths and effects.
Singing practice and training
Harmonics Pro also includes tools for singers. You can measure your vocal range, practise pitch matching, scales, arpeggios, intervals and chromatic exercises, and follow your pitch in real time.
A built-in lyrics system supports TXT and LRC files, timed lyrics, auto-scrolling, and a second-screen lyrics display for recording or performance.
Export your finished music
Finished songs can be exported as WAV, FLAC or OGG, including individual track stems. Harmonics Pro also supports MIDI import and export, autosaving, crash recovery, and configurable folders for projects, sounds, plug-ins and exports.
Harmonics Pro is built for singers, producers, songwriters and musicians who want one place to create ideas, build songs, record vocals, tune performances, experiment with instruments and effects, and turn those ideas into finished music.
| Updated | 20 days ago |
| Published | 21 days ago |
| Status | In development |
| Category | Tool |
| Author | ScarletMoonDev |
| Tags | Audio, audio-production, auto-tune, daws, Indie, Music, Music Production, Retro |
| AI Disclosure | AI Assisted, Graphics, Text |
Purchase
In order to download this DAW Tool you must purchase it at or above the minimum price of £20 GBP. You will get access to the following files:















Leave a comment
Log in with itch.io to leave a comment.